Coordinated Revit model
Electrical services modelled to the agreed LOD, on the project's shared coordinates and worksets, issued as RVT and NWC for the federated model.
We model electrical services in Revit from the consultant's design, coordinate them against the other trades, and issue the shop drawings and as-builts your contract calls for. Electrical only, on your title block if you want.
On a coordinated project the electrical services go in after the ductwork and pipework have taken the easy routes. If your containment isn't in the federated model by the time the mechanical and hydraulic trades issue theirs, you're left threading tray through whatever is left and arguing about it on site.
ElecDraft models electrical services in Revit for electrical contractors who need to be in that model and don't want to run a BIM department to do it. We take the consultant's design drawings, build them as a proper Revit model with real tray sizes, luminaire families and switchboard footprints, and coordinate it with the other trades through the weekly clash cycle until the ceiling works.
Because we only draw electrical, you're not sharing a drafter with the plumber. The person modelling your tray knows what a 600 mm ladder with a 300 mm bend radius needs, where the segregation has to be, and how far an emergency luminaire can sit from the one next to it.
One coordinated model feeds every drawing issue on the job, so the shop drawings, set-out and as-builts all agree with each other.
Electrical services modelled to the agreed LOD, on the project's shared coordinates and worksets, issued as RVT and NWC for the federated model.
Navisworks clash runs against structure, mechanical, hydraulic and fire, with each electrical clash resolved or raised with the designer.
Containment, lighting, power and comms layouts cut from the model, dimensioned off grids, with sections where the ceiling is tight.
Luminaire, board, cable tray and equipment schedules generated from the model, so the counts match the drawings.
Hanger, penetration and equipment points exported for your site team or the builder's surveyor.
The model updated from your mark-ups at the end of the job, with as-built PDFs and DWGs and the files the handover schedule asks for.
Week one is set-up. We read the BIM Execution Plan, link the architectural and structural models, confirm the shared coordinates, and build the project template with your title block, your naming and the families the project needs. If the project has no BEP, we write a short one-page version for the electrical scope so everyone knows what's being modelled and to what detail.
Then it's the coordination cycle. The federated model is reissued, usually weekly. We model the next area, run the clash test, work through the electrical clashes, and bring the ones that need a design decision to you or the consultant with a marked-up view. Changes from the coordination meeting go into the model before the next issue.
Drawings come out as areas close. Once a zone is coordinated and signed off, we cut the shop drawings for it and issue them for approval, then for construction. At the end of the job the same model becomes the as-built record.
BEP, links, coordinates, your template and title block.
Electrical services built area by area to the agreed LOD.
Weekly clash runs and meetings until each zone is clear.
Shop drawings, schedules and set-out, then the as-built model.
You don't need to know Revit to brief one. Send us the consultant's electrical design as PDFs or DWGs, the link or invitation to the project's BIM 360 or Autodesk Construction Cloud folder, and the BIM Execution Plan if the builder has issued one. If there's a luminaire schedule or a switchboard schedule from the consultant, send that too, because it saves us asking what the fittings and boards actually are.
Back from us you get the Revit model issued to the federated model on the agreed cycle, an NWC for Navisworks, the clash reports for electrical with each item marked resolved or raised, and the shop drawings as PDF and DWG on your title block. At the end of the job the same model is updated to as-built and handed over with the drawings in whatever format the handover schedule asks for, usually RVT, IFC, PDF and DWG.
On a typical commercial floor plate the first model issue is the slowest, because that's where the template, families and coordinates get set up. After that the weekly cycle settles into a rhythm, and shop drawings start coming out as each zone is coordinated.
The architect's DWG or Revit model, or a clean PDF if that's all there is. We can convert or redraw from PDF.
Red pen on a print, photos with a reference, or a Bluebeam mark-up. Tell us the issue purpose: approval, construction or as-built.
Logo, company details and numbering if you want the set white-labelled. Otherwise the drawings go out on ours.
Not every job needs a model. A small fit-out is usually quicker in AutoCAD, and we'll tell you so. Revit earns its keep when the ceiling is congested, the builder has written BIM into the contract, or the client wants a model at handover.
We've modelled electrical services on all of these. See the drawing samples for what the output looks like.
Something else? Call 1800 066 565 or send the drawings through and ask.
No. Most of our contractor clients don't. We model in our own Revit licences inside the project's BIM 360 or Autodesk Construction Cloud environment, or on our own server if the project isn't cloud-based. You receive the PDF and DWG sheets you need on site, and the RVT and NWC files go to whoever the BIM Execution Plan says they go to.
Whatever the BIM Execution Plan asks for, which is usually LOD 300 for design coordination and LOD 400 where the model is used for installation and set-out. For as-builts we update the model to LOD 500 from your mark-ups and site photos. If the project has no BEP we'll agree the level with you before we start.
Cable tray, ladder, duct and conduit, busway, lighting and emergency lighting, general and essential power, switchboards and distribution boards, main switchrooms, communications pathways and racks, and security devices and pathways. We don't model mechanical, hydraulic or fire services.
Yes, online or in person in Sydney. We run through the clashes assigned to electrical, agree the fix with the other trades, and make the model changes before the next federated issue. You can attend as well or leave it with us and get a summary.
Yes. We audit the model first so you know what state it's in: wrong families, unconnected systems, elements on the wrong workset or level, and anything that will cause problems at as-built stage. Then we quote the fix and the ongoing work separately.
No. Your electrical consultant or engineer designs it and signs off on it. We document and coordinate that design so it can be built, and we raise anything that doesn't fit or clashes with the designer before it becomes a site problem.
Tray, ladder, duct, conduit and busway routes coordinated against the ducts and pipes, with supports and sections.
View service 01For-approval and for-construction layouts dimensioned off the grid, so your crew installs from a drawing, not a guess.
View service 02Your site mark-ups turned into the as-constructed set the builder is chasing, with circuit numbers, board references and emergency IDs.
View serviceDWG, RVT or PDF, your mark-ups and your title block. If you'd rather talk it through first, call 1800 066 565.